AWWA TO BEGIN WORKING ON 37 STANDARDS REVISIONS December 28, 2022Standard Notices AWWA TO BEGIN WORKING ON 37 STANDARDS REVISIONS Dec. 23, 2022 The AWWA Standards Program announces that work will soon begin on several standards. This notice also announces the intent to have the responsible standards committee, or subcommittee, begin the process of completing the next revised edition within the 5-year revision cycle set by the AWWA Standards Council and the American National Standards Institute. This notice also allows interested parties an opportunity to provide comments for consideration, or to become involved in the standard revision process. The list of standards and staff liaisons appear below. For more information or questions, please contact the staff liaison assigned to the standard by clicking on their name below to email them. Paul Olson, Standards Sr. Manager Nathan Edman Jason Hrdlicka Frank Kurtz Emily Meek Liz Ralph ******************************************************************************************************************************************************************************************************* AWWA B114 Reverse Osmosis and Nanofiltration Systems for Water Treatment Jason AWWA B200 Sodium Chloride Nathan AWWA B304 Liquid Oxygen for Ozone Generation for Water, Wastewater, & Reclaimed Water Systems Liz AWWA C110/A21.10 Ductile-Iron and Gray-Iron Fittings Jason AWWA C150/A21.50 Thickness Design of Ductile-Iron Pipe Jason AWWA C213 Fusion-Bonded Epoxy Coatings & Linings for Steel Pipe and Fittings Liz AWWA C215 Extruded Polyolefin Coatings for Steel Water Pipe Liz AWWA C230 Stainless-Steel Full-Encirclement Repair and Service Connection Clamps for 2" - 12" (50-mm - 300-mm) Pipe Liz AWWA C503 Wet-Barrel Fire Hydrants Emily AWWA C510 Double Check-Valve Backflow Prevention Assembly Emily AWWA C511 Reduced-Pressure Principle Backflow Prevention Assembly Emily AWWA C516 Large-Diameter Rubber-Seated Butterfly Valves, Sizes 78" (2000 mm) and Larger Jason AWWA C517 Resilient-Seated Cast-Iron Eccentric Plug Valves Jason AWWA C530 Pilot-Operated Control Valves Jason AWWA C541 Hydraulic and Pneumatic Cylinder and Vane-Type Actuators for Valves and Slide Gates Emily AWWA C542 Electric Motor Actuators for Valves and Slide Gates Emily AWWA C560 Cast-Iron Slide Gates Emily AWWA C561 Fabricated Stainless-Steel Slide Gates Emily AWWA C562 Fabricated Aluminum Slide Gates Emily AWWA C563 Fabricated Composite Slide Gates Emily AWWA C605 Underground Installation of Polyvinyl Chloride (PVC) and Molecularly Oriented Polyvinyl Chloride (PVCO) Pressure Pipe and Fittings Jason AWWA C606 Grooved and Shouldered Joints Jason AWWA C623 Cured-In-Place Pipe (CIPP) Emily AWWA C654 Disinfection of Wells Emily AWWA C671 Online Turbidimeter Operation and Maintenance Liz AWWA C715 Cold Water Meters - Electromagnetic & Ultrasonic Type for Revenue Applications Frank AWWA C800 Underground Service Line Valves and Fittings Liz AWWA C900 Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4"-60" (100 mm - 1,500 mm) Jason AWWA C903 Polyethylene-Aluminum-Polyethylene (PE-AL-PE) Composite Pressure Pipe, 12 mm (1/2 In.) Through 51 mm (2 In.) for Water Service Paul AWWA C906 Polyethylene (PE) Pressure Pipe & Fittings, 4 In. Through 65 In. (100 mm Through 1,650 mm), for Waterworks Paul AWWA C909 Molecularly Oriented PVCO Pressure Pipe, 4 In. (100 mm) and Larger Jason AWWA D100 Welded Carbon Steel Tanks for Storage Frank AWWA D102 Coating Steel Water-Storage Tanks Frank AWWA E103 Horizontal and Vertical Line-Shaft Pumps Jason AWWA G200 Distribution Systems Operation and Management Paul AWWA G300 Source Water Protection Emily AWWA G510 Wastewater Treatment Plant Operation and Management Emily AWWA G560 Stormwater Management for Water Utilities Frank AWWA J100 Risk and Resilience Management Liz